SITE PREPARATION
From hospital expansion to multi-acre greenfield developments, we adapt to each site’s unique requirements.
OHSU CEI ECEC
​
Location: Portland, OR
Completed: 2020
Highlights: We prepared the site for the new Children’s Eye Clinic at OHSU’s main campus on Marquam Hill. This new building has been placed in a logistically challenging location on the hillside. Not only did our team excavate through basalt rock for the foundation, but we operated between an ambulance route and operational hospital facilities.
Seaside Middle School / High School
Location: Seaside, OR
Completed: 2020
Highlights: This project placed over 300,000 CY of cement treated soil in Oregon’s wet, coastal climate. Working closely with the State of Oregon’s Department of Environmental Quality and the Federal Army Corps of Engineers, the project worked in and around ephemeral streams and wetlands, taming very steep topography to offer Seaside a new school with a breathtaking view.
Sherwood High School
​
Location: Sherwood, OR
Completed: 2020
Highlights: The New Sherwood High School is now the largest high school in the state of Oregon, with an impressive 7 new sport fields spread out on a sprawling 72 acre campus. Earthwork included moving over 400,000 CY of native soil. The building pad terraces over three independent slab on grade elevations, with breathtaking views of Mount Hood and the Willamette Valley.
Oregon State Capitol
​
Location: Salem, OR
Completed: 2018
Highlights: ​Oregon State Capitol Accessibility, Maintenance & Safety (CAMS) Renovation. This project consisted of constructing two 5,000 square foot mechanical rooms directly against the existing Oregon State Capitol without having the ability to remove the existing marble clad exterior, while working around the Oregon Legislative Schedule.
Vista Logistics Park
​
Location: Gresham, OR
Completed: 2017
Highlights: Consists of three new concrete tilt up buildings on a 37 acre campus, totaling over 730,000 SF of industrial space. The entire project was completed within one year.
Franklin High School
​
Location: Portland, OR
Completed: 2017
Highlights: Modernization of the historical public high school that was constructed over 100 years ago. This project included a complete renovation of the historical buildings as well as construction of new gym facilities and classrooms. In additional to that, our team successfully relocated a 210,000 lb statue of Benjamin Franklin.
Nyberg Rivers
​
Location: Tualatin, OR
Completed: 2015
Highlights: ​Tualatin mixed-use development that includes retail, restaurants, and entertainment space and is now the home of Cabela’s.
Diamler Nova
​
Location: Portland, OR
Completed: 2017
Highlights: New Corporate Office and Parking Garage for Daimler Trucks North America, located on the Columbia River waterfront in Swan Island. This project included demolition of the existing facility, along with new construction of a towering office building and multi-level parking garage.
SolarWorld USA
​
Location: Hillsboro, OR
Completed: 2009
Highlights: 200,000 square foot building expansion, including all site grading, cement treated soil, and wet utilities.
Randall Children's Hospital
At Legacy Emanuel
​
Location: Portland, OR
Completed: 2011
Highlights: This project accounted for
multi-phased construction, allowing for uninterrupted hospital operations to build a state-of-the-art children’s hospital within Emanuel’s existing campus. Challenging utilities were installed to service a new Central Utility Plant and active Emergency Department with helipad.
Tri-City Water Pollution Control Plant
​
Location: Clackamas County, OR
Completed: 2010
Highlights: ​This expansion helped the
Tri-City plant treat up to 60million gallons of wastewater a day serving Gladstone, Oregon City, and West Linn.
Evergreen Aviation & Space Museum
​
Location: McMinnville, OR
Completed: 2010
Highlights: ​Constructed haul roads between the McMinnville Municipal Airport and Evergreen Aviation campus to land and transport a Boeing 747 aircraft for display on the new Wings and Waves Waterpark.